After working closely with the college, The Viglen Storage Group proposed a Hitachi AMS 200 with 4TB useable capacity as the essential Storage Area Networks prime requirement at Walsall College. An integrated backup solution was also required to backup the Storage Area Network. The AMS offered the College a highly scalable reliable and cost effective platform for a first SAN deployment with tiered storage, consolidation, backup and data archiving. The AMS 200 also allows for future expansion and can form part of the college’s disaster recovery and business continuity procedures.
A 5 blade server was also supplied and is connected to the SAN through a McData switch. The backup is achieved utilising an Overland tape library and Veritas software. All the equipment was supplied and housed in 2 x 42U racks. Viglen also provides a maintenance contract as an ongoing service as part of the installation so Griggs and his team are covered for any eventuality.
The Viglen Storage Group designed, installed and configured the total solution, which was installed and working within 3 days, and Griggs is equally enthusiastic about the service which was provided by Viglen:
“Viglen were very professional in their approach, they ensured that all requirements were met prior to installation. Equipment delivery was on time. Installation went without a hitch and the training given to staff was more than adequate to meet our needs.”
Andy Griggs,
Walsall’s IT Technical Manager
Everything was planned meticulously by The Viglen Storage Group and Griggs’ IT team at the college, so there were no surprises, even when it came to the results which were exactly what the college had expected! Although the rest of the college may be initially unaware of all the improvements that have been made behind the scenes, they are definitely experiencing the benefits of having quicker back up times & a safer storage solution. The SAN has resulted in improving efficiency at the college the clustered servers reduce the risk of data loss, and back up times have improved.
The changes make for increased efficiency across the whole college and will allow for further IT expansion. The college says it will even look at expanding the SAN further at a later date.
“The updated servers and SAN will contribute to Walsall College fulfiling it’s aims to continue to progress a vision for the future with a curriculum which is not only business enabled but business driven... building real world skills for today’s jobs and fuel innovations which will propel the industries of tomorrow. Empowering and motivating individuals to become job-ready, effective contributors to industry while fulfiling their own potential, extending their aspirations and feeding their creativity in a dynamic and interactive forum which brings business leaders and learners together. The fact that the installation of a new storage solution and SAN is barely noticeable other than to those behind the scenes really is a sign of great success, and all departments at the college will be better off having data storage that is secure and fast”.
Bordan Tkachuk,
Chief Executive Officer, Viglen